Reconstruction of unit No.3 of Kaniv HPP was completed

Consortium “RPA “Ukrhidroenerhobud” has completed the reconstruction of the electrical equipment of unit No. 3 of Kaniv HPP Branch of PJSC “Ukrhydroenerho”. The act of commissioning of unit No. 3 was signed on March 28, 2017.

The reconstruction included construction work on existing buildings and facilities, supply of equipment, replacement of electrical equipment with generator voltage of 3.15 kV and 6.3kV, replacement of excitation system, control system of integrated cable system and auxiliary process systems of hydroelectric generating sets.

All work was performed in accordance with the requirements of the state standards, reference and process documentation.