CONSTRUCTION OF THE SECOND PHASE OF THE DNIESTER PSPP AS A PART OF THE FOURTH HYDRAULIC UNIT

June 2018

The Consortium RPA Ukrgidroenergobud dismantled concrete blocks from the drainage chamber of hydraulic unit No. 4 of the Dniester pumped storage power plant with a total volume of 40m³ (approximately 100 tons).