News

  • REPEARING OF WATER PIPES OF DNIPROVSKA HPP

    In April 2018, the Consortium RPA Ukrgidroenergobud began repairing concrete surfaces and insulating the water pipes of the hydraulic units of the Dniprovska HPP branch of PJSC Ukrhydroenergo (Zaporizhia).

  • INSTALLING OF THE REINFORCED CONSTRUCTION OF THE CRANE BEAM (HYDROGENERATING UNIT NO. 4 OF THE DNIESTER PSPP)

    On April, 2018 the Сonsortium RPA Ukrgidroenergobud has installed the reinforced construction of the crane beam over the hydrogenerating unit No. 4 of the Dniester pumped storage power plant into the design position. The weight of the reinforced construction is 25.2 tons.

     

     

  • ISO certificate validation

    April 16, 2018, Bureau Veritas Certification Ukraine conducted a supervisory audit in the Consortium RPA Ukrgidroenergobud, in accordance with the standards and norms of the International Organization for Standardization (ISO). The audit results confirmed the full compliance of the integrated quality and environmental management system, which operates in the Consortium, with the requirements of the international standards ISO 9001: 2015 “Quality Management Systems” and ISO 14001: 2015 “Environmental Management Systems”.

Pages