News
-
CONSORTIUM RPA UKRGIDROENERGOBUD RECEIVED CERTIFICATES OF THE INTERNATIONAL QUALITY SYSTEM (ISO)
June 2020. Following the results of the recertification audit, the Consortium RPA Ukrgidroenergobud received certificates of compliance with international standards ISO 9001:2015 and ISO 14001:2015. The audit was carried out by specialists from Bureau Veritas Ukraine.
-
CONSTRUCTION OF THE OBJECT AT KAKHOVKA HPP
May 2020
Work on the construction of a hangar-type warehouse began at the Kakhova HPP. Its purpose and feature is the storage of equipment, spare parts and materials that require special conditions, namely maintaining the necessary temperature conditions. Construction work is carried out by the Consortium RPA Ukrgidroenergobud.
-
STAGES OF CONSTRUCTION OF THE DNIESTER PSPP APRIL 2020
April 2020
As part of the construction of the second stage of the Dniester PSPP of PJSC "Ukrhydroenergo", the housing of the guide bearing was successfully transferred to the mine. The housing of the guide bearing has a diameter of about 4.8 meters and a total weight of 35 tons.


